Access to gas transmissions system
2019/2020, 2018/2019, 2017/2018, 2016/2017 network access conditions / feesConsultation of network users according to article 4 (2) commission regulation (EU) 2015/703 (network code on interoperability and data exchange rules) on proposed update of the interconnection agreement.
Open Grid Europe GmbH is obliged to consult the network users on the update of the interconnection agreement Ellund. Please see the enclosed document. If applicable please provide your comments by 06 February 2019.
for the yearly auction 2017
Capacity demand at the North-Entries (H-Gas)A major task of the natural gas industry is to provide a secure and reliable supply to end consumers.
Gas crisis preparednessFind out about the technical requirements that apply to network connections.
Network connectionsTransmission system network operators are obligated to publish by 15 November each year the capacity data on internal orders placed by network operators located directly downstream of network operators with entry-exit systems as set out in Sec. 11 (9) of the Cooperation Agreement (CoA). In accordance with Sec. 11 (2) CoA, such capacity data will be made available per network connection point or exit zone on our website specifying the names of the relevant downstream network operators.
As set out in the CoA, the data will be published on the basis of the information status of the ongoing order procedure and the information communicated by the relevant downstream network operators. An intra-year capacity adjustment during the ongoing order year pursuant to Sec. 15 CoA does not involve updating of the information published.
Internal order capacity dataConversion date for metering point designations on the OGE grid
Metering point designations & L-H-gas conversion (market area conversion)