  • Pipeline construction projects under the gas network development plan (NDP Gas)

    The 2014 gas network development plan (NDP) and the subsequent NDPs currently under discussion contain a number of agreed construction measures to optimise the natural gas infrastructure in Germany and at the border crossing points.

  • Epe-to-Legden loop line (LEL)

    The regional planning procedure (ROV) for the natural gas transmission pipeline from Epe to Werne was completed in February 2015 with a regional impact assessment by the district government of Münster which confirmed the new pipeline’s compatibility with regional planning requirements.

  • Forchheim-to-Finsing loop line (LFF)

    Under the 2012 and 2013 NDPs, Open Grid Europe will build a loop line from the Open Grid Europe/bayernets station at Forchheim to the station in Finsing.

  • Schwandorf-to-Forchheim (Arresting) loop line (LSF)

    The project is intended to allow new gas storage facilities and new gas-fired power plants to be connected to the network and help meet the capacity requirements of downstream network operators and cooperation partners in the NetConnect Germany (NCG) market area.

  • Project name
    ZEELINK
  • Project description
    The ZEELINK project includes the new ZEELINK gas transmission pipeline from Lichtenbusch on Germany’s border with Belgium to Sankt Hubert near Krefeld and from there to Legden near Ahaus in North Rhine-Westphalia as well as a compressor station in the Aachen area. The new transmission pipeline will make an important contribution to security of supply in Germany. It will also boost gas transmission capacities from the north to the south.
  • Contact details of project promoter
    ZEELINK GmbH Co. KG, Kallenbergstr. 5, 45141 Essen, Germany
  • Information on planned public consultation
    The dates of the public hearings and discussions to be held as part of the planning permission procedure, which will commence in September 2017, will be decided and published during the course of the project.

www.zeelink.de

Related reading

  • Pipeline construction projects under the gas network development plan (NDP Gas)

    The 2014 gas network development plan (NDP) and the subsequent NDPs currently under discussion contain a number of agreed construction measures to optimise the natural gas infrastructure in Germany and at the border crossing points.

  • Epe-to-Legden loop line (LEL)

    The regional planning procedure (ROV) for the natural gas transmission pipeline from Epe to Werne was completed in February 2015 with a regional impact assessment by the district government of Münster which confirmed the new pipeline’s compatibility with regional planning requirements.

  • Forchheim-to-Finsing loop line (LFF)

    Under the 2012 and 2013 NDPs, Open Grid Europe will build a loop line from the Open Grid Europe/bayernets station at Forchheim to the station in Finsing.

  • Schwandorf-to-Forchheim (Arresting) loop line (LSF)

    The project is intended to allow new gas storage facilities and new gas-fired power plants to be connected to the network and help meet the capacity requirements of downstream network operators and cooperation partners in the NetConnect Germany (NCG) market area.